Wisconsin DNR's latest Clean Water Fund Program and Safe Drinking Water Loan Program rosters, adopted April 2026, show the combined list at 1,091 projects, down from 1,163 prior, a net decline of 72. Tracked value across the current list stands at $4.6B. During this period, 430 projects appeared on the priority list for the first time, together valued at $1.4B, while 175 entered the fundable range carrying $639.2M. Separately, 480 projects no longer appear on the current list; the list does not say why. Cost estimates changed on 332 projects, with a net rise of $297.8M on file.
Construct New WWTP. Est. cost $126.5M.
Upgrade WWTP - Phosphorus, Upgrade Equip, Add Biosolids Drying. Requested $55.5M.
Construct New CL contact tank/UV disinfect/pumps. Requested $52.3M.
The most concrete movement this cycle is the entry of City of Jefferson's wastewater treatment plant project, which appeared on the priority list for the first time with an estimated cost of $126.5M, among the largest figures in this month's new listings. City of Oak Creek was also added to the list, with a drinking water project to construct a chlorine contact tank, UV disinfection, lift pumps, and piping carrying an estimated cost of $50.0M. City of Portage shows a requested amount of $55.5M on file for a wastewater treatment plant upgrade addressing phosphorus removal, equipment upgrades, and biosolids drying.
Across the category rollup, wastewater treatment carries the largest tracked value at $2.0B across 223 projects, while collection and sewer work spans the most projects among the listed categories at 307, valued at $922.3M. Watermain and distribution work totals 226 projects at $385.7M, and PFAS and emerging contaminants work, smallest by count at 38 projects, still carries $385.8M in tracked value, a figure close to the watermain category despite far fewer projects.
Smaller movements also appear on the roster. Village of Iron Ridge climbed in priority rank for a headworks upgrade replacing pumps and installing a new screen, estimated at $1.5M, and City of Stanley climbed in priority rank for a well rehabilitation project estimated at $326K. Neither carries the dollar weight of the larger new listings, but both sit on the same roster adopted April 2026.
The gap between 430 new listings and 480 projects no longer listed stands out in this cycle's data, a reminder that entries and exits move independently of the net total of 72 and do not explain each other on the current Wisconsin DNR documents.
Projects the state has flagged as fundable — the closest signal to imminent procurement. Ordered by requested amount.
| Entity | Scope | Program | Requested |
|---|---|---|---|
| City of Portage | Upgrade WWTP - Phosphorus, Upgrade Equip, Add Biosolids Drying | CWFP | $55.5M |
| City of Oak Creek | Construct New CL contact tank/UV disinfect/pumps | SDWLP | $52.3M |
| City of Oshkosh | Upgrade WWTP - Construct Tertiary Filtration for Phosphorus | CWFP | $44.3M |
| City of Horicon | Upgrade WWTF | CWFP | $39.8M |
| City of Sheboygan | Southside Sanitary Interceptor Sewer System - Phases 1 & 2 | CWFP | $31.7M |
| Milwaukee MSD | Install Oklahoma Avenue MIS Capacity Improvements C03013C01 | CWFP | $27.6M |
| City of Sparta | Upgrade WWTP for Phosphorus Compliance | CWFP | $14.5M |
| Green Bay MSD | Upgrade East River Lift Station & Force Main | CWFP | $14.4M |
Projects that climbed materially in priority (rank, or priority score where a state scores projects) since the previous list — the least-watched signal in the document.
| Entity | Scope | Program | Rank movement |
|---|---|---|---|
| City of Stanley | Rehab Well #3 | SDWLP | score 174 → 388 |
| Village of Iron Ridge | Upgrade Headworks - Replace Pumps; Install New Screen | CWFP | score 50 → 84 |
| Village of Superior | Relocate Outfall Piping for WWTP | CWFP | score 66 → 99 |
| City of Mayville | Replace Watermains on Muzzy St and Allen St | SDWLP | score 54 → 77 |
| Lakeland SD #1 ‐ Oneida | Upgrade WWTP | CWFP | score 62 → 84 |
| Village of Bagley | Replace SS - Jackley Lane, Walnut & Chicago Street | CWFP | score 50 → 65 |
| Dunn SD | Rehab Sanitary Sewer and Upgrade Lift Stations | CWFP | score 50 → 65 |
| Brockway SD | Replace Force Main - Lincoln Street | CWFP | score 54.9 → 69.6 |
| Iron River SD | Stabilize and Upgrade Lift Station | CWFP | score 75 → 85 |
Projects seeking SRF financing — not every municipal water or wastewater project in Wisconsin. Source: Wisconsin DNR — Clean Water Fund Program, Safe Drinking Water Loan Program (IUP/PPL). Stages are labeled precisely; "no longer listed" does not assert an outcome.